New Roof!

The interior sanctuary ceiling began showing signs of water staining several months ago.  This month (January, 2025) the Church Board chose a contractor to replace our shingle roofing (not the flat roof portion).  Before the new shingles can be installed there needs to be some modification / repair of the roof line.   We are having the covered walkway removed on the west side of the church.  A portion of the covered entry at the Polk Street entry will also be removed.

All of these improvements won't be cheap!  Your contributions towards the ROOF REPAIR FUND would be greatly appreciated.